When should utilities be disconnected before a demolition project?

Prepare for the Massachusetts 4G Hoisting License Test. Utilize interactive quizzes and multiple choice challenges designed to enhance your understanding. Gear up for success!

Utilities should be disconnected at the beginning of the project to ensure the safety of workers and the surrounding area. This precaution helps prevent accidents related to live electrical lines, gas, water, and other utilities that may be present. Disconnecting utilities early in the process allows for a thorough assessment of the site, enables safe operations from the start, and minimizes the risk of unexpected hazards during demolition activities.

By addressing utility disconnections at the outset, project managers can avoid situations where heavy machinery operates near live utilities, reducing the risk of severe accidents and ensuring that the site is secure before any demolition work begins. Additionally, waiting until the arrival of heavy machinery, the presence of utilities within the demolition zone, or until the end of demolition work does not align with safety protocols and guidelines that prioritize the welfare of all personnel involved.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy